archive-au.com » AU » F » FLOODINGSOLUTIONS.COM.AU

Total: 37

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Flooding Solutions - Contact
    Address does not appear to be valid please make any necessary corrections Flooding Solutions Advisory Group 14 Page Street Moruya NSW 2537 PH 612 4474 4711 Full Name E Mail Address Type security code here Enquiry info floodingsolutions com au

    Original URL path: http://www.floodingsolutions.com.au/contact.php/action/send (2015-10-07)
    Open archived version from archive



  • JW Player goes here

    Original URL path: http://www.floodingsolutions.com.au/jwplayer.php?video=national-flood-forum.flv&thumb=tv-news-thumb.jpg (2015-10-07)
    Open archived version from archive

  • Flooding Solutions - Principle of operation
    The flood wall floats and rises When the basin is totally filled theangled support block will Iock the barrier into position making it watertight 3 The floodwater can now continue to rise without flooding the protected area As the water level subsides back to its normal level the flood water in the basin is drained by either gravity or a pump located in the service pit through drain pipes which

    Original URL path: http://www.floodingsolutions.com.au/info-pages-scfb.php?pages_id=70 (2015-10-07)
    Open archived version from archive

  • Flooding Solutions - Product Detail
    wall is covered by a galvanized steel lid The fill and drain pipe are connected to the service pit The support block is designed in that it presses the seals waterproof to the basin and end closings The SCFB barriers need a solid foundation plate of 150 mm 2 SCFB with concrete basin The basins are made from prefab concrete elements of 2 meters in length The two ends of the barrier are sealed with end closings The concrete basins are reinforced with steel The basin can be built in unlimited lengths The floating wall consists of a PUR foam core with a fiberglass outer layer The wall is fabricated in standard 1 m length and then joined to form the overall length of the required floating wall The wall endures 10 times maximum water pressure The wall is covered by a galvanized steel lid The fill and drain pipe are connected to the service pit The support block is designed in that it presses the seals waterproof to the basin and end closings The SCFB barriers need a solid foundation plate of 150 mm 3 SCFB Service Pit The service pit is a fundamental component of the operation of the SCFB barrier where the invert of the basin is lower than the storm water outfall It also acts as a silt trap to the inlet as an added safe guard against silting up If there is a watercourse or other means of draining the basin from its invert level a service pit will not be necessary The pit also houses a submersible pump for lowering the floating water after flood levels have dropped This table shows the standard SCFB in different measurements Type 1 metres 2 metres 3 metres 4 metres 5 metres 6 metres 7 metres 8 metres

    Original URL path: http://www.floodingsolutions.com.au/info-pages-scfb.php?pages_id=71 (2015-10-07)
    Open archived version from archive

  • Flooding Solutions - Brochure Downloads
    Flooding Solutions TV SCFB Principle of operation Product Detail Brochure Downloads Downloads File Title SCFB Brochure Download SCFD Brochure Download info floodingsolutions com au t 612 4474 4711 f 612

    Original URL path: http://www.floodingsolutions.com.au/info-pages-scfb.php?pages_id=72 (2015-10-07)
    Open archived version from archive



  •